DEFINITION

It is the carrier top coat coating of two component and solvent free.antistatic epoxy floor coating system Public Works Pos. No: 04.379/H03

USAGE AREAS

It is used as carrier top coat coating of antistatic floor coating system in industrial floors, hospitals, operating rooms, laboratories, production and storage, in the areas of sensitive electrical and electronic equipment where there is a risk of explosion.

Type
 
TS EN 1504-2/ April 2008 Principle 5(PR): 5.1 Physical Resistance / Surface Improvement Coating Application C

Colour

RAL colors without affecting conductivity.

Outlook

Mat

Solid Matter by Weight, %

100

Density

1,22 g/cm³
Waste 0,300-1,200 kg / m2
Package 19.76 kg A Component+ 5 kg B Component :Total 24.76 kg

Flash Point

>25 °C

Mixture Ratio

3,95 / 1

Application Methods

Brush, Roller, Trowel

Mixture Life

40 minutes / 25°C

Shelf Life

1 year

Waiting Time Between Coats

12 hours / 25°C

Drying Time

12 hours / 25°C

Mechanical Strength

 

7 days
Electrostatic Reaction Ground resistance Rg<106 ohm                             ( IEC 61340-4-1)
Average ground resistance 104 ≤ Rg ≤ 106 ohm  ( IEC 61340-4-1)
The distance should be at least 50 cm the conductivity measuring points on the ground. If there are inadequate points during the measurement, additional measurements should be made within 50 cm of these points. Results of ground conductivity measurements (< 35 MΏ (IEC 61340-4-1) are the values that are considered in the measurement area.
Equipment Cleaning
 
Epoxy Thinner
  SURFACE PREPARATION

* The surfaces to be applied must be free from oil, dust, and dirty.

* Free parts on the surface, cement grout on concrete surfaces and parts that prevent adhesion must be cleaned.

MIXING PREPARATION
A and B component should be mixed with a low speed mixer for at least 3-4 minutes until a homogenous mixture is obtained by paying attention to mixture ratios. It is ready for application after mixing.

COATING SYSTEM
Grounding tapes are placed 12 hours later after the SC 325 conductive primer complete its curing. The bands are connected to the main line of the structure. After the SC 470 antistatic epoxy coating mixture has been completed Spread on the surface with roller or combed trowel.
APPLICATION CONDITIONS

* Surface should have sufficient strength. The concrete has a compression strength of at least 25 N/mm², nd a tensile strength of at least 1,5-2 N/mm².

* The surface must be clean and dry. Humidity must not exceed 5%, If the humidity is above this ratio, SC 220 100% Epoxy Primer for humid surfaces used on humid surfaces should be preferred.

* The 325 Epoxy Conductive Primer should be completed its cure before starting the top coat.

* Avoid application in very humid environments and below 10°C.

* Mixing ratios should be considered.

Products that can be used under this product:

* 325 Epoxy Conductive Primer