E-KATALOGLAR
RAL K7 Classic
Teknik Şartnameler
MAKİNA PARKURUMUZ
E-KATALOGLAR
RAL K7 Classic
Teknik Şartnameler
MAKİNA PARKURUMUZ

ASPHALT PAINT1K

ACRYLIC ASPHALT PAINT

DEFINITION

High strength one component acrylic asphalt paint with specific chemical and physical properties, ready to use.

USAGE AREAS

It is used in painting and coating as protective of all kinds of asphalt and concrete floors, in the creation of security road corridors, in determining the bicycle and pedestrian walkways, in parks for public transport vehicles, in painting and coating for protective and decorative purposes of all kinds of asphalt and concrete floors of gardens and playgrounds.

Type

 

TS EN 1504-2/April 2008 Principle 5(PR): 5.1 Physical Strenght/Surface Improvement Coating Application C

Colour

White (RAL colors)

Outlook

Mate

Thinner

It can be thinned with water.

Solid Matter by Weight, %

75

Density

1,50 g/cm³

Waste

0,600 – 0,700 kg / m2

Package

20 kg

Application Methods

Brush, Roller, Airless Gun

Shelf Life

1 year

Dust Drying Time

1-2 hours /25 °C

Touch Drying

3-4 hours/25 °C

Waiting Time Between Coating

5-6 hours/25 °C

Equipment Cleaning

It is cleaned with water.

SURFACE PREPARATION
* It is necessary to completely remove the oil, dirt and all kinds of residues on the surfaces to be applied and the dust on the surface must be washed and cleaned from the surface
* Free parts on the surface should be cleaned.
* There is no need for any surface smoothing on normal burnished concrete surfaces that do not use hardener. Parts that prevent adhesion on the surfaces should be cleaned.
* The surface where surface hardener, curing-forming products and paraffin derivatives are used on concrete surfaces should be re-roughened so product can be used.

APPLICATION CONDITIONS
The product is ready for use. The product should be mixed for at least 3-4 minutes with the aid of a low speed mixer until a homogenous mixture is obtained. Application of the first coat primer is applied to the surface by diluting the product ½. Application of the second and third coat can be applied without diluting the product or optionally diluting it by 10% depending on the waiting times between the layers. After the product is applied, it is 24 hours to fully dry and open to light pedestrian traffic.
* Application should be avoided below 10°C and in very humid environments.
* During and after application, the floor must be protected from bad weather conditions such as rain, hail and snow for 24 hours.